Growth in german wind capacity is slowing. Soo… then the plan is to keep on with lignite and gas? Am I missing something?

Installed Wind Capacty - Germany

German Wind Capacity

  • tryptaminev@feddit.de
    link
    fedilink
    arrow-up
    4
    arrow-down
    1
    ·
    1 year ago

    It is not a yes and, because urgency favors renewables even more. If it wouldn’t be for bureaucratic and political hurdles, from planning to operation is about 2 years for onshore wind and solar sites. For things like retrofitting a small solar plant on a residential or industrial building it can be as short as three months and for balcony solar power as a small hobby project it is as little as a day of planning + the delivery time + a day of installation.

    Nuclear plants on the other side take minimum a decade, more likely two decades and that is despite strong political and bureaucratic support that is needed to get it going at all. Otherwise with citizens protest it would stay in court indefenitely.